Construction started on the new Cambridge skatepark at Dominion Avenue in August 2022. It was partially opened in December 2022 for skaters to be able to enjoy many of the new features such as the flow bowl, a step up quarter pipe with a flat ledge, a bank, pump dump, wedges with a rail feature, stair set, euro gap and down rail, a pocket corner and hipped 4.5 foot quarter pipe – just to name a few!
Two rounds of community consultations were held to ensure the skatepark designs were designed for all ability levels and was a space that the community would be proud of and use regularly.
The full facility was opened Friday 29 March 2023, to celebrate the opening an event was held with a DJ, food trucks and giveaways.